

Installation should take place within 2 weeks. Woo hoo!

Andrew returned this past Saturday with door, drawer and side panels, shelves, drawers, plus some shim and trim pieces. It was a full day of work (11 hours) but the cabinets look great! One really nice detail is the wall cabinet hinge - it allows the door to open 170 degrees. 
A lighting installation, by PSLAB, in London, using recycled car headlights, incandescent light bulbs, and red fabric electric cord. 
We are now researching countertop options... I think we've narrowed it down to either slate or soapstone.
Even though we try to keep our 'stuff' to a minimum, we're human, we're an architect and a structural engineer, we like books and projects and collecting things, so... we have a lot of 'stuff' and a lot of this 'stuff' still doesn't have a home, as seen in the photos above.