April 14, 2011
some backyard eye candy...
A few beautiful NYC urban gardens by Foras Studio.
... yo, warm weather... anytime you feel like making an appearance...
April 6, 2011
bookworm
... in keeping with spring-cleaning efforts, I've been busy sorting thru/organizing books... lots and lots of books.... so very many books... we have too many... we're addicted...
In managing the addiction, I'm always on the hunt for library storage ideas... one of my favorites is Kartell's Bookworm. It's pricey... and it doesn't hold many books... but it's beautiful!
powder room sink options
Option A:
Duravit Happy D. Handrinse Basin
$180.00
Option B:
Whitehuas Wall Mount Basin
$275.90
Option C:
Duravit D-Code Bathroom Sink
$92.00
... faucet options forthcoming.
Duravit Happy D. Handrinse Basin
$180.00
Option B:
Whitehuas Wall Mount Basin
$275.90
Option C:
Duravit D-Code Bathroom Sink
$92.00
... faucet options forthcoming.
March 29, 2011
the April to-do list...
... Charlevoix's April to-do list? + Lounge on couch... done and doing.
+ Shed winter coat... getting it done while lounging on the couch.
Mine is a little longer...
GENERAL:
+
+ Organize books/bookshelves (
+
+
+ Wash windows (inside and out)
+
+
+
+
+
+ Purchase a few planters/pots and replant plants that are currently in leaky pots
STUDY:
+
+
+
+
LIVING / DINING ROOMS:
+
+ Assemble pendant light fixture
+
+
UPDATE: The Craigslist dude has gone M.I.A. (GASP! No... REALLY???) Oh well... the search for a new Craigslist dude has begun...
+
+
BASEMENT:
+ Organize laundry zone
+ Move misc. items to the basement (sewing machine, tool cart, glass panel)
+ Install cabinet hardware
+
+ Finish outfitting basement powder room (mirror, shelves, hooks)
+
+
OUTSIDE:
Front Yard
+
+
+
Back Yard
+
+
UPDATE:
Grass seed is not taking... more drastic measures will be required come May.
2011 Landscaping Plan complete. Follow-up in May.
FEELING AMBITIOUS AND IN-THE-MONEY:
+ Pick up Enje shades from Ikea and install them (needed in the dining room and upstairs)
+
February 1, 2011
basement update...
photo taken looking east... towards closed off nasty other half of basement.Looking good... with our crazy tight budget, definite improvement... except for:
1) The electrical and plumbing connections for the washer and dryer.
They bother me to no end... visually, they disturb me. I'd even go so far to say that they are flat out offensive. They scream, "HEY THERE, YOOHOO! YEAH YOU... LOOK AT ME!!! I DISRUPT THE ENTIRE BASEMENT WITH MY INTESTINAL APPEARANCE...".
2) The mammoth piece of ductwork running the entire length of the basement.
How ugly can you get? ... why oh why, dear previous owner, would you place that thing smack down the middle? WHY?
... well, we needed the washer and dryer connections to be accessible... and as for the ductwork, it is just way too expensive to move... so, I'm just going to ignore them. You can too...
photo taken looking west... towards door to backyard.The bathroom still needs a little attention:
... along with a somewhat long list of other items still to be addressed:
January 14, 2011
basement progress...
... slow... but getting there.Plumbing roughed in. Electrical roughed in. Insulation in. Drywall is up, taped and mudded. Brick wall sanded and primed. Concrete floor patched. Tile floor starting to go in...
... yet still so much to do.
... not loving the tile... but it doesn't offend me, so I think we can learn to live in harmony. Budget ($1.07/sf) beat aesthetic (approx. $3/sf) this time around. It's the basement... I'm keeping perspective.
... we almost gave up on the bathroom. The existing WC booth was raised on a plywood platform... below the plywood was a sand subfloor... yes, sand. Actually, the entire basement floor has been quite the challenge... the existing concrete floor is only about 1" thick... Ideally, we would have loved to have just a nice, high quality, smooth and sealed concrete floor throughout the entire basement... we seriously considered digging up the existing floor, dropping it about 8" and re-pouring the concrete... that way we'd get (much needed) extra head clearance and a finished floor... but budget doesn't allow... $$$$$. Alas, the patching and $1.07/sf tile solution...Washer and Dryer are scheduled to be delivered next week... stay tuned.
January 10, 2011
the basement - finishes
December 23, 2010
the basement
existing plan
new plan
reflected ceiling / electrical plan
new plan
reflected ceiling / electrical plan
... it's time.
I've avoided talking about the basement... I've shirked from posting photos of it... it's a frightening, and embarassing, place... but, it's time to tackle it...
We use it to access the backyard... we use it for doing laundry... we use it as a construction workshop... and we could use it for organized and clean/dry storage (instead, it's a dumping ground)...
So, we have decided to tackle the back half... it will serve as kind of a 'mud room' entry from the backyard, with laundry area, storage closets and powder room. The front half, which houses the furnace and water heater, will be used as our 'workshop' and overflow storage, and will stay unfinished for now...
July 5, 2010
June 3, 2010
May 19, 2010
May 4, 2010
Subscribe to:
Posts (Atom)












































