After much tweaking and deliberation, we think we've figured out the second floor. To be honest, the drywaller started today, so we had to call it quits on massaging majority of the design...
We still have a few outstanding items not shown in the plan above: Shelving/Desk between the two closets in the Master Bedroom - we're looking at a system from Atlas Industries; the ship's ladder, at the roof hatch, for means of accessing our future Green Roof; the stairs (treads and risers need to be rebuilt), guardrail and handrail; finished flooring (we think we'll go with carpet, it's cheaper, but wood floors would be sooooo nice...); AND the Master Bathroom.
May 14, 2007
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment