August 14, 2007
Master Bathroom Revisited
Current status of the master bathroom... progress to be noted is located on the left side of the photo above. The water supply for the sink is in and the outlet that will be in the medicine cabinet has been located. Running water supply for each faucet and installing the sink waste pipe is next...
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment