

I'm not quite sure how the 2 walls connect... there's no strapping nor any lapping of the 2x6s at the ceiling... I think that shim of a 2x4 may the link... scary.
WAY too large of a gap b/w the window and the framing... and I still cannot believe they cut that vertical 2x4.
We met with the contractor this afternoon and said that the work has to be completely redone... he agreed. Basically, he said he wasn't around to supervise the work and it was done in a rush and is totally unacceptable. So, they are starting from scratch tomorrow morning. I hope I hope I hope they get it right this time. I'm sticking around in the morning to supervise.
Oh... and to top it all off, we discovered some wasps made a nest in our wall - in the cavity between the brick and the plaster/lath interior wall. Brilliant. That explains why we've been discovering a handful of wasps in that back room, on the first floor... including a wasp that buzzed itself into my shoe and stung me. Mean bugger.
Front (Master) Bedroom - Pocket door into new bathroom.
Skylight opening in corridor. In-progress, additional framing still necessary, along with additional framing in order to level the entire corridor ceiling... You can kind of see it in the photo above - there is about 1 1/2" difference in height, using the bottom of the ceiling joist as a measuring point, between the masonry wall and the interior corridor partition wall. It becomes startingly obvious with the skylight opening.
Hall closet and entry into master bedroom (the entry to the bedroom hasn't really changed, we just wanted to try and make the doorway slightly wider, since originally it was only 2'-4").